Skip to content
Hubstake

Agency · awarded bid prices

Cornish, ME: awarded unit prices

36 winning bid prices read from 1 source documents, 2024. The table lists the 36 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Cornish, ME

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Temporary Water for #1 Thompson Streetls1—$7,500$7,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Bridge Crossingls1—$65,000$65,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Flowable Fill for Trench Applicationcubic yard1—$200.00$200.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Mechanical Sweepingls1—$10,000$10,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Asphalt concrete pavement for driveway apronston1—$300.00$300.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
2-inch HDPE Service Pipelinear foot1—$60.00$60.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
2-inch Curb Stops and Boxeach1—$800.00$800.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
1-inch HDPE Service Pipelinear foot1—$70.00$70.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Existing Hydrantseach1—$2,500$2,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
New Hydrantseach1—$7,000$7,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Remove and Reset Granite Curblinear foot1—$50.00$50.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Sidewalk Pavementton1—$300.00$300.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Final Pavementton1—$150.00$150.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Initial Pavementton1—$100.00$100.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Erosion Controlsls1—$5,000$5,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
2 inch pipe insulationlinear foot1—$10.00$10.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Test Pit Excavation and Backfilleach1—$1,500$1,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Suitable Material to Replace Unsuitable Materialcubic yard1—$25.00$25.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Unsuitable Material Excavation Below Gradecubic yard1—$10.00$10.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Trench Ledge Excavationcubic yard1—$150.00$150.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Remove and Relay Existing Utilitieslinear foot1—$40.00$40.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
1-Inch Curb Stops and Boxeach1—$350.00$350.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Di fittingpound1—$20.00$20.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
2 inch corporation stopseach1—$500.00$500.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
1 inch corporation stopseach1—$500.00$500.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
2 inch blow off assemblyeach1—$3,500$3,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Concrete sidewalksquare yard1—$300.00$300.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
12 inch ductile iron water mainlinear foot1—$250.00$250.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
6 inch ductile iron water mainlinear foot1—$150.00$150.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
8 inch ductile iron water mainlinear foot1—$175.00$175.00Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
12 inch gate valve & boxeach1—$4,000$4,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
8 inch gate valve & boxeach1—$2,000$2,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
6 inch gate valve & boxeach1—$1,500$1,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
6 inch insertion valveeach1—$7,500$7,500Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Traffic Controlls1—$291,000$291,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗
Mobilization and Demobilizationls1—$90,000$90,000Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Maine: statewide figures.