| Temporary Water for #1 Thompson Street | ls | 1 | — | $7,500 | $7,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Bridge Crossing | ls | 1 | — | $65,000 | $65,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Flowable Fill for Trench Application | cubic yard | 1 | — | $200.00 | $200.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Mechanical Sweeping | ls | 1 | — | $10,000 | $10,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Asphalt concrete pavement for driveway aprons | ton | 1 | — | $300.00 | $300.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 2-inch HDPE Service Pipe | linear foot | 1 | — | $60.00 | $60.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 2-inch Curb Stops and Box | each | 1 | — | $800.00 | $800.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 1-inch HDPE Service Pipe | linear foot | 1 | — | $70.00 | $70.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Existing Hydrants | each | 1 | — | $2,500 | $2,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| New Hydrants | each | 1 | — | $7,000 | $7,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Remove and Reset Granite Curb | linear foot | 1 | — | $50.00 | $50.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Sidewalk Pavement | ton | 1 | — | $300.00 | $300.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Final Pavement | ton | 1 | — | $150.00 | $150.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Initial Pavement | ton | 1 | — | $100.00 | $100.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Erosion Controls | ls | 1 | — | $5,000 | $5,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 2 inch pipe insulation | linear foot | 1 | — | $10.00 | $10.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Test Pit Excavation and Backfill | each | 1 | — | $1,500 | $1,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Suitable Material to Replace Unsuitable Material | cubic yard | 1 | — | $25.00 | $25.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Unsuitable Material Excavation Below Grade | cubic yard | 1 | — | $10.00 | $10.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Trench Ledge Excavation | cubic yard | 1 | — | $150.00 | $150.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Remove and Relay Existing Utilities | linear foot | 1 | — | $40.00 | $40.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 1-Inch Curb Stops and Box | each | 1 | — | $350.00 | $350.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Di fitting | pound | 1 | — | $20.00 | $20.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 2 inch corporation stops | each | 1 | — | $500.00 | $500.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 1 inch corporation stops | each | 1 | — | $500.00 | $500.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 2 inch blow off assembly | each | 1 | — | $3,500 | $3,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Concrete sidewalk | square yard | 1 | — | $300.00 | $300.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 12 inch ductile iron water main | linear foot | 1 | — | $250.00 | $250.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 6 inch ductile iron water main | linear foot | 1 | — | $150.00 | $150.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 8 inch ductile iron water main | linear foot | 1 | — | $175.00 | $175.00 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 12 inch gate valve & box | each | 1 | — | $4,000 | $4,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 8 inch gate valve & box | each | 1 | — | $2,000 | $2,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 6 inch gate valve & box | each | 1 | — | $1,500 | $1,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| 6 inch insertion valve | each | 1 | — | $7,500 | $7,500 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Traffic Control | ls | 1 | — | $291,000 | $291,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |
| Mobilization and Demobilization | ls | 1 | — | $90,000 | $90,000 | Apr 8, 2024, Open bid tab, Route 25 Water Main Replacement / 20953 ↗ |