Skip to content
Hubstake

Agency · awarded bid prices

Columbus Consolidated Government: awarded unit prices

694 winning bid prices read from 20 source documents, 2009–2024. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Columbus Consolidated Government

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Permanent Grassingacre4—$1,462$800.00 – $6,000Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Suicide blanket - bl/blue size 54 inchx 80 incheach3—$75.00$57.00 – $75.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Suicide blanket - bl/green size 54 inchx 80 incheach3—$75.00$57.00 – $75.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Suicide Smock - XXL/BLUE - XXLeach3—$100.00$75.00 – $118.90Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Suicide smock - small/blue - standardeach3—$78.00$57.00 – $78.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Suicide Smock - JR/BLUE - Juvenileeach3—$78.00$57.00 – $78.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Sheet Flat - Navy - 58x90 58x90doz3—$34.92$34.92 – $36.51Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Sheet Flat - ORANGE T130 Twincs3—$34.92$34.92 – $38.77Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Required) Wash Cloths; Orange; 12x12 12x12cs3—$2.93$2.93 – $3.44Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Bath towels; 22x44 (sample required) 22 inchx44 inchdoz3—$14.19$13.41 – $17.90Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Towels; orange; 20 inchx40 inch 20x40doz3—$17.95$13.19 – $18.18Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Blankets - Orange 66x90each3—$7.60$6.54 – $12.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Blankets - Gray, 50% Wool 66x90each3—$13.17$5.54 – $13.17Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Blankets - Cozy 66x90cs3—$78.00$5.36 – $81.75Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Blanket 66x90each3—$5.20$5.20 – $5.45Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Mattress Cover 30x75x4each3—$21.35$13.90 – $21.35Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Mattress - Jail 30x75x4each3—$31.60$31.60 – $67.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
CATEGORY B: MATTRESSES & LINENS Mattress - Prison 26x72x4each3—$36.60$36.60 – $67.00Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Plastic Filter Fabricsquare yard3—$3.85$3.14 – $37.29Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Maintenance Of Construction Exiteach3—$1,081$1.00 – $1,081Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Traffic Controlls3—$65,000$16,730 – $65,000Feb 19, 2021, Open bid tab, RFB21-0014 ↗
Suicide Spoon 2500 /casecs2—$229.90$149.90 – $229.90Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Thermal Pants - White 5XLdoz2—$30.29$30.29 – $37.24Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Thermal Pants - White 4XLdoz2—$30.29$30.29 – $35.24Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Thermal Pants - White 3XLdoz2—$30.29$30.29 – $33.24Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Thermal Pants - White 2XLdoz2—$30.29$30.29 – $31.97Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
Thermal Pants - White Small - XLgdoz2—$30.29$30.29 – $30.41Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
INMATE CLOTHING 5XLargedoz2—$30.29$30.29 – $37.24Apr 28, 2021, Open bid tab, contract RFB21-0021 ↗
SODsquare yard2—$14.80$6.43 – $14.80Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Fertilizer nitrogen contentpound2—$11.70$6.90 – $11.70Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Fertilizer mixed gradeton2—$467.65$467.65 – $862.65Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Agricultural Limeton2—$117.00$17.26 – $117.00Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Temporary Silt Fence, Type Clinear foot2—$5.60$3.55 – $5.60Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Water quality inspectionsmonth2—$935.25$517.59 – $935.25Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Water quality monitoring and samplingeach2—$87.70$87.70 – $115.02Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Maintenance of inlet sediment trapeach2—$104.00$104.00 – $154.87Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Maintenance of check dams, all typeslinear foot2—$2.85$1.55 – $2.85Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Maintenance of temporary silt fence TPClinear foot2—$0.75$0.75 – $1.60Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Mulchington2—$146.25$146.25 – $287.55Aug 7, 2024, Open bid tab, contract RFB24-0040 ↗
Temporary Grassingacre2—$1,265$650.00 – $1,265May 16, 2018, Open bid tab, RFB18-0050 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.