City of Mesa: awarded unit prices

661 winning bid prices read from 6 source documents, 2025–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Mesa

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Construction Survey and Stakingls3—$90,194$7,600 – $90,194Aug 21, 2025, Open bid tab, S912 ↗
Complete Set Of Conductors For The Circuit.ls2—$136,626$95,494 – $136,626Aug 21, 2025, Open bid tab, S912 ↗
5 Gallon Shrubeach2—$15.72$15.72 – $45.00Aug 21, 2025, Open bid tab, S912 ↗
City Touch Nodeeach2—$760.00$760.00Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Streetlighting Conduitlinear foot2—$3.80$3.80Jul 17, 2025, Open bid tab, M99-2025-003 ↗
#5 Pull Boxeach2—$782.00$782.00Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Streetlight Pole Foundationeach2—$1,946$1,946Jul 17, 2025, Open bid tab, M99-2025-003 ↗
#9 Fiber Optic Pull Boxeach2—$9,260$9,260 – $9,270Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Fiber Optic Line (4-sets)linear foot2—$11.49$11.49 – $11.50Jul 17, 2025, Open bid tab, M99-2025-003 ↗
160w LED Streetlight Luminaireeach2—$633.00$633.00Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Pavement stripe (complete) per approved signing and stripe plansls2—$50,560$26,370 – $50,560Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Existing Barbwire Fence to be Removedlinear foot2—$2.80$2.80 – $3.16Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Existing Headwall to be Demolished and Removeeach2—$5,160$5,160Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Utility trench and backfill com m- 19.04.01square yard2—$658.00$658.00 – $662.00Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Curb stop with flushing pipe mag 390 type a and restraint joint per mag 303each2—$4,120$4,120Jul 17, 2025, Open bid tab, M99-2025-003 ↗
15 inch hdpe storm pipelinear foot2—$126.00$102.00 – $126.00Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Adjust valve box and cover mag 391-1 and spec section 505 with concrete collareach2—$1,222$1,222Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Concrete Sidewalk MAG 230square foot2—$8.34$8.34 – $8.84Jul 17, 2025, Open bid tab, M99-2025-003 ↗
6 inch verticle curb & gutter mag 220, type alinear foot2—$38.10$38.10 – $38.40Jul 17, 2025, Open bid tab, M99-2025-003 ↗
6 inch concrete over 4 inch abc com m-46.06 and m-42square foot2—$14.00$14.00 – $14.80Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Paving construction 5.5 inch ac over 10 inch abc per section no1 on sht pv04square yard2—$74.90$74.90 – $77.30Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Dust and Stormwater Permit Compliancels2—$51,390$6,980 – $51,390Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Traffic Control Plan & Off-Duty Police Officerls2—$214,200$2,499 – $214,200Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Traffic Controlls2—$75,495$43,415 – $75,495Dec 18, 2025, Open bid tab, CP0517GAS ↗
Pedestrian Push Buttoneach2—$1,468$1,468 – $1,508Jul 17, 2025, Open bid tab, M99-2025-003 ↗
Mobilization/Demobilizationls2—$683,700$121,293 – $683,700Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.5 inch sch 40 pvc gray electrical conduitlinear foot1—$8.90$8.90Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 4.0 inch sch 40 pvc sleevelinear foot1—$12.70$12.70Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 0.75 inch sch 40 pvc drip lateral pipe with sch 40 pvc fittinglinear foot1—$3.80$3.80Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 2.0 inch sch 40 pvc mainline pipe with sch 80 pvc fittinglinear foot1—$19.05$19.05Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.5 inch sch 40 pvc mainline pipe with sch 80 pvc fittinglinear foot1—$8.90$8.90Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.0 inch sch 40 pvc mainline pipe with sch 80 pvc fittinglinear foot1—$19.05$19.05Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and Install Drip Flush End Cap Assemblyeach1—$114.50$114.50Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and Install Multi-Outlet Emittereach1—$63.50$63.50Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.0 inch drip remote control valve assemblyeach1—$1,130$1,130Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 2.0 inch isolation ball valve assemblyeach1—$889.00$889.00Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.5 inch isolation ball valve assemblyeach1—$825.50$825.50Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.0 inch isolation ball valve assemblyeach1—$762.00$762.00Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.0 inch quick coulpereach1—$889.00$889.00Jul 23, 2026, Open bid tab, CP0982 ↗
Furnish and install 1.0 inch master valve and 1.0 inch flow sensor assemblyeach1—$2,539$2,539Jul 23, 2026, Open bid tab, CP0982 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.