| Unclassified Excavation | cubic yard | 11 | $50.00 | $10.00 | $10.00 – $100.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Gate Box Adjusted | each | 9 | $350.00 | $350.00 | $100.00 – $500.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Police Detail Allowance | day | 8 | $360.00 | $360.00 | $360.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Restore Disturbed Landscape Areas | square yard | 8 | $8.00 | $8.00 | $3.00 – $13.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Calcium Chloride for Dust Control | pound | 8 | — | $0.1 | $0.01 – $0.5 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Stump Removed | each | 8 | $500.00 | $500.00 | $300.00 – $1,000 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Hot Mix Asphalt-Binder 19mm | ton | 7 | $165.00 | $165.00 | $78.00 – $530.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Reclaimed Pavement for Base Course | square yard | 7 | $13.00 | $13.00 | $6.25 – $40.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| 3road party quality control testing | all | 6 | $1.00 | $1.00 | $1.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Drainage Structure Rebuilt | vf | 6 | $225.00 | $225.00 | $100.00 – $325.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Granite Curb Type VA4 - Straight | linear foot | 6 | $75.00 | $75.00 | $75.00 | Aug 6, 2025, Open bid tab, French Street & Father Morissette Blvd Improvements ↗ |
| 4in Reflectorized White Line (Thermoplastic) | linear foot | 5 | $2.00 | $2.00 | $2.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Hot Mix Asphalt-Top 12.5mm | ton | 5 | — | $165.00 | $0.01 – $165.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Bitumen For Tack Coat | gl | 5 | $5.00 | $5.00 | $4.95 – $6.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Superpave Surface Course – 9.5 – Polymer (Ssc – 9.5 – P) | ton | 5 | $99.00 | $99.00 | $94.95 – $105.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Service Box Adjusted | each | 5 | $300.00 | $300.00 | $50.00 – $300.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Curb Removed and Reset | linear foot | 5 | $45.00 | $29.00 | $25.00 – $45.00 | Feb 18, 2026, Open bid tab, Reconstruction of Streets and Sidewalks ↗ |
| Drainage Structure Adjusted | each | 5 | $325.00 | $325.00 | $325.00 – $1,000 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Cement Concrete Sidewalk | square yard | 5 | $135.00 | $105.00 | $95.00 – $195.00 | Feb 18, 2026, Open bid tab, Reconstruction of Streets and Sidewalks ↗ |
| Crushed Stone | ton | 5 | $50.00 | $50.00 | $25.00 – $50.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Bitumen for Tack Coat | gallon | 4 | — | $10.00 | $0.01 – $10.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Sediment Control Barrier – Straw Wattle | linear foot | 4 | — | $10.00 | $6.00 – $10.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Equipment For Engineers Field Office | all | 4 | — | $1.00 | $1.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Hot Mix Asphalt Sidewalk Or Driveway | square yard | 4 | — | $30.00 | $30.00 – $60.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Sediment fence | linear foot | 4 | — | $20.00 | $6.50 – $20.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Walls And Steps Removed And Rebuilt | cubic yard | 4 | — | $25.00 | $25.00 – $350.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Remove of drainage structure sediment | cubic yard | 4 | — | $100.00 | $100.00 – $150.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Frame And Grate (Or Cover) Municipal Standard | each | 4 | — | $600.00 | $600.00 – $1,050 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Clearing And Grubbing And Root Trimming | square foot | 4 | — | $5.00 | $5.00 – $8.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Superpave Intermediate Course – 19.0 (Sic – 19.0) | ton | 4 | — | $89.00 | $89.00 – $125.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Tree Pruning | each | 4 | — | $500.00 | $500.00 – $750.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Rock Excavation | cubic yard | 4 | — | $500.00 | $10.00 – $500.00 | Feb 18, 2026, Open bid tab, 2026 Reclaim and Paving of Streets (3-year: 2026/2027/2028) ↗ |
| Fine Grading and Excavation | square yard | 3 | — | $15.00 | $15.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| 8in PVC Pipe | linear foot | 3 | — | $0.01 | $0.01 – $250.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Frame and Cover - Municipal Standard | each | 3 | — | $1,500 | $1,500 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Catch Basin Municipal - Standard | each | 3 | — | $0.01 | $0.01 – $12,000 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Cement Concrete Wheelchair Ramp | square yard | 3 | — | $195.00 | $135.00 – $200.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Miscellaneous Hot Mix Asphalt | ton | 3 | — | $300.00 | $225.00 – $300.00 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| Tree Removed | each | 3 | — | $2,500 | $2,500 – $3,200 | May 15, 2024, Open bid tab, Reconstruction of Concrete Wheelchair Ramps and Sidewalks at Bailey and Daley Schools ↗ |
| 4” Reflectorized Yellow Line (Thermoplastic) | linear foot | 3 | — | $0.75 | $0.75 – $2.00 | Feb 18, 2026, Open bid tab, Reconstruction of Streets and Sidewalks ↗ |