| 1-1/2 inch - hot mix asphalt, 9.5mm, surface, type b, pg 64-22 | ton | 2 | — | $135.00 | $135.00 – $155.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Milling, variable deep, asphalt 1-1/2 inch to 0 inch | square yard | 2 | — | $3.00 | $3.00 – $6.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Tack Coat, 0.10 Gal/S.Y. | gallon | 2 | — | $4.00 | $4.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pavement Message Marking, Thermoplastic R x R | each | 1 | — | $475.00 | $475.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pavement Message Marking, Thermoplastic Lane Indication Arrow | each | 1 | — | $180.00 | $180.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Line, thermoplastic, solid, white, 24 inch | linear foot | 1 | — | $10.45 | $10.45 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Line, thermoplastic, solid, white, 12 inch | linear foot | 1 | — | $5.00 | $5.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Line, thermoplastic, solid, white, 8 inch | linear foot | 1 | — | $7.85 | $7.85 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Line, thermoplastic, solid, yellow, 4 inch (double yellow centerline) | linear foot | 1 | — | $4.30 | $4.30 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Catch Basin, Type E, As Per Plan | each | 1 | — | $3,480 | $3,480 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Gate valve and valve box (8 inch) | each | 1 | — | $4,060 | $4,060 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Tapping sleeve with valve, 6 inchx6 inch | each | 1 | — | $14,350 | $14,350 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Water service connection, 2 inch, as per plan | linear foot | 1 | — | $300.00 | $300.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Water service connection, 3/4 inch, as per plan | linear foot | 1 | — | $160.00 | $160.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| 8 inch watermain, pvc c-900 dr-18, as per plan | linear foot | 1 | — | $105.00 | $105.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pipe, type 2, circular, 12 inch 907.17 | linear foot | 1 | — | $400.00 | $400.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pipe, type 2, circular, 8 inch 907.17 | linear foot | 1 | — | $150.00 | $150.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Combined Concrete Curb And Gutter (Vertical), As Per Plan | linear foot | 1 | — | $40.00 | $40.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Curb Ramp, Concrete | square foot | 1 | — | $15.50 | $15.50 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| 4 inch sidewalk, concrete | square foot | 1 | — | $8.00 | $8.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| 2-1/2 inch - hot mix asphalt, 12mm, intermediate, type b, pg 64-22 | ton | 1 | — | $127.00 | $127.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| 3 inch hot mix asphalt, 19mm, base, type b, pg64-22 | ton | 1 | — | $122.00 | $122.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Service Box Removed | each | 1 | — | $1,050 | $1,050 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pavement remove, concrete | square yard | 1 | — | $60.00 | $60.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Mulched Seeding, Grass, Type 2 | square yard | 1 | — | $40.00 | $40.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Subgrade Treatment, Type 1 | square yard | 1 | — | $8.14 | $8.14 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Compaction aggregate, no. 53, base | ton | 1 | — | $49.00 | $49.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pipe, type 4, circular, 8 inch, 907.23 | linear foot | 1 | — | $66.00 | $66.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pipe, type 4, circular, 6 inch, 907.23 | linear foot | 1 | — | $64.00 | $64.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pipe, type 4, circular, 4 inch, 907.23 | linear foot | 1 | — | $62.00 | $62.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Pccp for approaches, 6 inch | square yard | 1 | — | $100.00 | $100.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Concrete Curb, Vertical | linear foot | 1 | — | $55.00 | $55.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Subgrade Treatment, Type 1C, As Per Plan | square yard | 1 | — | $75.00 | $75.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Excavation, Common, As Per Plan | cubic yard | 1 | — | $44.00 | $44.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| 6 inch water main, pvc c-900, dr18, as per plan | linear foot | 1 | — | $100.00 | $100.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Meter Pit Removed | each | 1 | — | $420.00 | $420.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Traffic Controls For Construction And Maintenance Operations, As Per Plan | ls | 1 | — | $15,700 | $15,700 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Temporary Inlet Protection | each | 1 | — | $300.00 | $300.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Sidewalk Concrete, Remove | square yard | 1 | — | $16.00 | $16.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |
| Curb, Concrete, Remove | linear foot | 1 | — | $13.00 | $13.00 | May 8, 2025, Open bid tab, bidtabindeaaur2401pdf-s0 ↗ |