Skip to contentSkip to content
Hubstake
Paving HS-PAV-CURB-CG-X-RMV

Curb (removal)

Unit LF · Lettings Aug 27, 1999 – Sep 4, 2026 · 13 agencies · 13 agency descriptions pooled

Pooled median

$8.00/ LF

p25–p75
$5.00 – $14.00
Prices in the median
6,760
Source documents
4,369
States
10
p25 $5.00p75 $14.00

364 of 7,124 prices fell outside the Tukey fences (p25 − 1.5×IQR to p75 + 1.5×IQR) and are excluded from the figures above. They remain on the item pages below.

The 13 descriptions behind this price

Each agency prints this item in its own words. Every one keeps its own page and its own median; this page is the pooled view.

As the agency printed itWinning bidsMedianp25–p75
Removing Curb & Gutter3,102$6.00$3.75 – $10.00
Curb and Gutter, Rem3,014$11.00$7.00 – $19.00
Removal of Curb and Gutter564$7.00$5.00 – $10.00
Curb and Gutter, Remove398$15.00$9.74 – $25.00
Remove CONC Curb & Gutter23$12.00$10.00 – $29.50
NS Remove Exist. Curb or Curb and Gutter thin8$15.50$11.14 – $27.50
NS Remove Exist. Curb and Gutter thin6$25.50$20.12 – $28.44
NS Remove Exist Curb & Gutter thin3$12.00$11.00 – $18.50
Conc Curb and Gutter, Rem thin2$22.50$20.25 – $24.75
NS Remove Exist. Curb and Curb & Gutter thin1$20.00$20.00 – $20.00
REM of Curb & Gutter thin1$4.00$4.00 – $4.00
Removal of Curb (Curb and Gutter) thin1$15.00$15.00 – $15.00
Removal of Curb and Gutter (Existing) thin1$18.00$18.00 – $18.00

By agency

MDOT3,016
WisDOT2,253
ALDOT849
Oklahoma DOT491
INDOT398
NDDOT58
City of Fort Worth23
ITD16
VDOT (NOVa (9))15
TDOT2
VDOT (Bristol (1))1
VDOT (Richmond (4))1

By state

Michigan3,016
Wisconsin2,253
Alabama849
Oklahoma491
Indiana398
North Dakota58
Texas23
Virginia18
Idaho16
Tennessee2

How this bucket was built

Hubstake parses each printed description into structured attributes — material, class, size, work type — and mints the identifier HS-PAV-CURB-CG-X-RMV from them. Only descriptions the parser accounted for in full are pooled; anything it could not read in full keeps its own page and stays out of this median, because the part it could not read is usually the part that moves the price. Award, bid and final-payment prices are never blended — this bucket is award prices.

How the index is built