Skip to contentSkip to content
Hubstake
Erosion Control HS-ERO-SLTFNC-RMV

Silt fence (removal)

Unit LF · Lettings Jun 25, 2004 – Sep 29, 2026 · 29 agencies · 3 agency descriptions pooled

Pooled median

$1.00/ LF

p25–p75
$0.64 – $1.50
Prices in the median
5,458
Source documents
4,548
States
4
p25 $0.64p75 $1.50

373 of 5,831 prices fell outside the Tukey fences (p25 − 1.5×IQR to p75 + 1.5×IQR) and are excluded from the figures above. They remain on the item pages below.

The 3 descriptions behind this price

Each agency prints this item in its own words. Every one keeps its own page and its own median; this page is the pooled view.

As the agency printed itWinning bidsMedianp25–p75
Temp Sedmt Cont Fence (Remove)869$1.00$1.00 – $1.75
Silt Fence Removal4,951$1.05$0.60 – $1.60
Remove Silt Fence11$1.00$1.00 – $1.60

By agency

ALDOT4,951
TxDOT (Dallas district)106
TxDOT (Austin district)75
TxDOT (Yoakum district)72
TxDOT (Fort Worth district)70
TxDOT (San Antonio district)54
TxDOT (Houston district)53
TxDOT (Bryan district)42
TxDOT (Paris district)42
TxDOT (Waco district)41
TxDOT (Lufkin district)38
TxDOT (Corpus Christi district)37

By state

Alabama4,951
Texas869
North Dakota10
Minnesota1

How this bucket was built

Hubstake parses each printed description into structured attributes — material, class, size, work type — and mints the identifier HS-ERO-SLTFNC-RMV from them. Only descriptions the parser accounted for in full are pooled; anything it could not read in full keeps its own page and stays out of this median, because the part it could not read is usually the part that moves the price. Award, bid and final-payment prices are never blended — this bucket is award prices.

How the index is built