Skip to contentSkip to content
Hubstake
Drainage HS-DRN-INLETOP-RMV

Inlet (removal)

Unit EA · Lettings Jul 30, 1999 – Sep 22, 2026 · 38 agencies · 16 agency descriptions pooled

Pooled median

$500/ EA

p25–p75
$305 – $861
Prices in the median
3,715
Source documents
2,130
States
16
p25 $305p75 $861

256 of 3,971 prices fell outside the Tukey fences (p25 − 1.5×IQR to p75 + 1.5×IQR) and are excluded from the figures above. They remain on the item pages below.

The 16 descriptions behind this price

Each agency prints this item in its own words. Every one keeps its own page and its own median; this page is the pooled view.

As the agency printed itWinning bidsMedianp25–p75
Removing Inlets2,397$400$280 – $579
Remove Inlet778$1,333$846 – $2,000
Inlet, Remove372$642$450 – $1,000
Remove Catch Basin167$665$398 – $1,212
Removal of Inlets83$1,000$646 – $1,500
Catch Basin, Remove57$560$428 – $800
Remove Drop Inlet55$700$250 – $1,062
NS Remove Exist. Drop Inlet......42$857$548 – $1,217
Removal of Catch Basin thin7$550$445 – $1,027
Removing Catch Basin thin5$300$250 – $450
Remove Existing Catch Basin thin1$800$800 – $800
Removal of Inlet thin3$373$362 – $481
NS Remove Exist. Drop Inlet Sta. ??? thin1$1,000$1,000 – $1,000
NS Remove Exist. Inlets thin1$1,800$1,800 – $1,800
REM Drop Inlet thin1$2,300$2,300 – $2,300
Salvage Catch Basin thin1$500$500 – $500

By agency

WisDOT1,397
ALDOT1,000
INDOT429
Caltrans (District 4)119
KYTC106
MnDOT98
Caltrans (District 3)91
Caltrans (District 1)80
Caltrans (District 2)73
Utah DOT66
Caltrans (District 7)61
Caltrans (District 6)56

By state

Wisconsin1,397
Alabama1,000
California696
Indiana429
Kentucky106
Minnesota98
Oregon79
Utah66
Virginia44
Montana29
Idaho8
Washington6

How this bucket was built

Hubstake parses each printed description into structured attributes — material, class, size, work type — and mints the identifier HS-DRN-INLETOP-RMV from them. Only descriptions the parser accounted for in full are pooled; anything it could not read in full keeps its own page and stays out of this median, because the part it could not read is usually the part that moves the price. Award, bid and final-payment prices are never blended — this bucket is award prices.

How the index is built