Topsoil Surface, Furn, 3 Inch, Modified
Median winning unit price
Moderate 9 winning bids≈$1.31/ SYLow confidence
- Winning bids
- 9
- Source documents
- 9
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 9 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Feb 2, 2024
- Quantity
- 1750 Syd
- Contractor
- Anlaan Corporation
- Winning price
- $2.50 / SY
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $1.31
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 9 bids charted, so you can see clusters and outliers.
9 observations
Agency, county, letting date, quantity and the price as printed.
9 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other earthwork items priced per SY, ranked by how much evidence each has.
- Topsoil Surface, Furn, 4 Inch, Modified$4.0016 bids
- Topsoil Surface, Furn, 2 Inch, Modified$6.5010 bids
- Topsoil Surface, Furn, 4 Inch$5.25321 bids
- Topsoil Surface, Furn, 3 Inch$4.00243 bids
- Topsoil Surface, Furn, 2 Inch$3.35113 bids
- Topsoil Surface, Furn, 6 Inch$8.0023 bids
- Topsoil Surface, Furn, 12 Inch$13.8812 bids
- Furn & Place Topsoil (4")$3.00224 bids
9 observations
1 agency in 1 state · lettings Jun 5, 2015 – Feb 2, 2024
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.