Skip to content
Hubstake
Other 451.1

Temporary Ramping at Castings

Unit EA · Lettings Jun 20, 2025 – Jun 20, 2025 · 1 agency

2Winning bids
1Agencies
Jun 20, 2025 – Jun 20, 2025Letting period
Median winning unit price
Very thin 2 winning bids

$1.00/ EAThin data

Treat this as a rough guide. Only 2 winning bids sit behind this figure.
Winning bids
2

Sign in to see the middle-half range.

Source documents
2

Winning bids only, as awarded. Losing bids and engineer’s estimates are not counted. Nominal dollars. How we compute this

Where the number comes from

One of the 2 winning bids behind that median, with the agency’s own document one click away.

Agency
Upton, MA (owner per Wright-Pierce posting) · Massachusetts
Letting
Jun 20, 2025
Quantity
25 EA
Contractor
Harshaw Paving and Recl.
Winning price
$1.00 / EA
Open bid tab, Road Reclamation & Paving/ 22221 ↗BidTab_RoadRepair.pdf

Price distribution

Free account

The spread behind this median — every observed price, and where the middle half sits. A free account opens it.

Create a free account Sign in

The observation table

Free account

All 2 winning bids behind this median, each with its agency, letting date, quantity and the document it came from. A free account opens it.

Create a free account Sign in

All bids

Winning and losing bids

The page above counts winning bids only. For this item our files also hold 8 losing bids. Together with the 2 winning bids that have every-bidder records, that is 10 priced bids (5 bidders per line on average). Losing bids are counted here and nowhere else.

What the losing bidders wanted, and how far the winner was from the next bid, is part of Pro.

See what Pro adds

More with Pro

Compared across agencies

What each agency has paid for this item.

Median by quarter

How this item has priced over time.

Start your free trial Compare plans

New accounts get Pro free for 7 days, no card. Locked panels show what Pro adds; no Pro value is in this page until you are signed in on Pro.