Skip to content
Hubstake
Paving 429B021 · 429B201

Improved Bituminous Concrete Binder Layer, 25.0 MM Maximum Aggregate Size Mix, Esal Range A

Unit METRIC TON · Lettings Jun 28, 1996 – Jun 25, 1999 · 1 agency

56Winning bids
1Agencies
Jun 28, 1996 – Jun 25, 1999Letting period
Median winning unit price
Moderate 56 winning bids

$33.20/ METRIC TON

Winning bids
56

Sign in to see the middle-half range.

Source documents
55

Winning bids only, as awarded. Losing bids and engineer’s estimates are not counted. Nominal dollars. How we compute this

Where the number comes from

One of the 56 winning bids behind that median, with the agency’s own document one click away.

Agency
ALDOT · MORGAN, Alabama
Letting
Jun 25, 1999
Quantity
280 METRIC TON
Contractor
RILEY BRIDGE & ENGINEERING CO., INC., RUSSELLVILLE, AL
Winning price
$36.00 / METRIC TON
Open bid tab, contract STPOA-9215(2) ↗ljun2599.pdf

Price distribution

Free account

The spread behind this median — every observed price, and where the middle half sits. A free account opens it.

Create a free account Sign in

The observation table

Free account

All 56 winning bids behind this median, each with its agency, letting date, quantity and the document it came from. A free account opens it.

Create a free account Sign in

All bids

Winning and losing bids

The page above counts winning bids only. For this item our files also hold 104 losing bids. Together with the 56 winning bids that have every-bidder records, that is 160 priced bids (2.86 bidders per line on average). Losing bids are counted here and nowhere else.

What the losing bidders wanted, and how far the winner was from the next bid, is part of Pro.

See what Pro adds

More with Pro

Compared across agencies

What each agency has paid for this item.

Median by quarter

How this item has priced over time.

Start your free trial Compare plans

New accounts get Pro free for 7 days, no card. Locked panels show what Pro adds; no Pro value is in this page until you are signed in on Pro.