Fill, Lightweight, Expanded Polystyrene Block
Median winning unit price
Deep 14 winning bids$174/ CY
- Winning bids
- 14
- Source documents
- 14
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 14 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Dec 5, 2025
- Quantity
- 300 Cyd
- Contractor
- C. A. Hull Co., Inc.
- Winning price
- $154 / CY
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $174
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 14 bids charted, so you can see clusters and outliers.
14 observations
Agency, county, letting date, quantity and the price as printed.
14 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other earthwork items priced per CY, ranked by how much evidence each has.
- Fill, Lightweight, EPS Block$10322 bids
- Flowable Fill$2501,317 bids
- Flowable Fill, Non-structural$200411 bids
- Backfill Material (Flowable Fill)$335165 bids
- Controlled Density Fill$125114 bids
- Flowable Fill (Low Strength)$23183 bids
- Flowable Fill (General)$34064 bids
- Borrow Excavation (Sand Fill, Complete in Place)$46.0052 bids
14 observations
1 agency in 1 state · lettings Dec 3, 2021 – Dec 5, 2025
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.