Skip to content
Hubstake
Erosion Control

Erosion Control Lead

Unit HOUR · Lettings Mar 1, 2000 – Aug 1, 2001 · 1 agency

39Winning bids
1Agencies
Mar 1, 2000 – Aug 1, 2001Letting period
Median winning unit price
Moderate 39 winning bids

$50.00/ HOUR

Winning bids
39

Sign in to see the middle-half range.

Source documents
39

Winning bids only, as awarded. Losing bids and engineer’s estimates are not counted. Nominal dollars. How we compute this

Where the number comes from

One of the 39 winning bids behind that median, with the agency’s own document one click away.

Agency
WSDOT · Jefferson, Washington
Letting
Aug 1, 2001
Quantity
20 HR
Contractor
LAKESIDE INDUSTRIES
Winning price
$35.00 / HOUR
Open the source, line 17 ↗00c500.pdf

Price distribution

Free account

The spread behind this median — every observed price, and where the middle half sits. A free account opens it.

Create a free account Sign in

The observation table

Free account

All 39 winning bids behind this median, each with its agency, letting date, quantity and the document it came from. A free account opens it.

Create a free account Sign in

All bids

Winning and losing bids

The page above counts winning bids only. For this item our files also hold 126 losing bids. Together with the 39 winning bids that have every-bidder records, that is 165 priced bids (4.23 bidders per line on average). Losing bids are counted here and nowhere else.

What the losing bidders wanted, and how far the winner was from the next bid, is part of Pro.

See what Pro adds

More with Pro

Compared across agencies

What each agency has paid for this item.

Median by quarter

How this item has priced over time.

Start your free trial Compare plans

New accounts get Pro free for 7 days, no card. Locked panels show what Pro adds; no Pro value is in this page until you are signed in on Pro.