10X5 Precast Concrete Box Culvert

Unit LF · Lettings Jan 25, 2019 – May 15, 2026 · 6 agencies

10Winning bids
6Agencies
Jan 25, 2019 – May 15, 2026Letting period
Median winning unit price
Very thin 10 winning bids

$1,279/ LFThin data

Treat this as a rough guide. Only 10 winning bids sit behind this figure.
Winning bids
10

Sign in to see the middle-half range.

Source documents
10

Winning bids only, as awarded. Losing bids and engineer’s estimates are not counted. Nominal dollars. How we compute this

Where the number comes from

One of the 10 winning bids behind that median, with the agency’s own document one click away.

Agency
Polk County · Polk, Minnesota
Letting
May 15, 2026
Quantity
62 L F
Contractor
Davidson Construction Inc.
Winning price
$1,500 / LF
Open bid tab, SAP 060-599-301 ↗connex.rtvision.com

Price distribution

Free account

The spread behind this median — every observed price, and where the middle half sits. A free account opens it.

Create a free account Sign in

The observation table

Free account

All 10 winning bids behind this median, each with its agency, letting date, quantity and the document it came from. A free account opens it.

Create a free account Sign in

All bids

Winning and losing bids

The page above counts winning bids only. For this item our files also hold 42 losing bids. Together with the 10 winning bids that have every-bidder records, that is 52 priced bids (5.2 bidders per line on average). Losing bids are counted here and nowhere else.

What the losing bidders wanted, and how far the winner was from the next bid, is part of Pro.

See what Pro adds

More with Pro

Compared across agencies

What each agency has paid for this item.

Median by quarter

How this item has priced over time.

Start your free trial Compare plans

New accounts get Pro free for 7 days, no card. Locked panels show what Pro adds; no Pro value is in this page until you are signed in on Pro.