Winnetka Water & Electric: transformer bids
IL, municipal. 45 bidder rows from 18 documents, 15 different bidders, bids opened 2021-07-27 to 2025-01-07.
Source documents
| Bid opened | Document (the utility's own) |
|---|---|
| 2025-01-07 | MW-034 |
| 2024-09-17 | MW-033 |
| 2024-09-03 | MW-032 |
| 2024-03-20 | MW-031 |
| 2024-02-20 | MW-030 |
| 2024-02-06 | MW-029 |
| 2023-09-05 | MW-028 |
| 2023-07-13 | MW-027 |
| 2023-06-06 | MW-026 |
| 2023-04-03 | MW-025 |
| 2023-01-17 | MW-024 |
| 2023-01-03 | MW-023 |
| 2022-10-06 | MW-022 |
| 2022-09-06 | MW-021 |
| 2022-05-17 | MW-006 |
| 2022-03-15 | MW-005 |
| 2022-03-01 | MW-004 |
| 2022-02-15 | MW-003 |
Prices are the unit prices each utility printed for the bidder, as bid. Where a tab prints only a total, the unit price is that total divided by the quantity and labelled. Loss-evaluated (ownership) cost is never shown as a price. Units above 10 MVA are kept apart. A median needs 5 or more bids from 2 or more utilities; below that the page says so instead of showing a number. Every row links to the utility's own document. Not a quote, not an estimate.