Contractor Rhode Island
Mas Building & Bridge, Inc.
8Lettings bid
1Agencies
Sep 19, 2012 – Jul 20, 2021Date range
Agencies this contractor has bid with
RIDOT
Items most often priced
- Welded Stud Shear Connectors 3/4 Inch Diameter / EA
- Water for Dust Control / MGAL
- Utility Support System / LS
- Unanchored Barrier FOR Temporary Traffic Control Standard 40.5.0 / LF
- Truck Mounted Attenuator with Truck Mounted Flashing Arrow Board / HOUR
- Trimming and Fine Grading / SY
- Trainee Man-hours / MHRS
- THE Work ON This Bridge Will Consist OF Performing Steel Repairs TO Select Beam Ends AS Indicated ON THE Repair Plans TO Prevent Further / LS
- Test Pits / EA
- Temporary Support OF Existing Utility / LS
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Jul 20, 2021 | RIDOT | 2020-CB-037 | Open the bid tab ↗pmp.dot.ri.gov |
| May 14, 2021 | RIDOT | 2020-CB-064 | Open the bid tab ↗pmp.dot.ri.gov |
| Nov 15, 2019 | RIDOT | 2019-CB-101 | Open the bid tab ↗pmp.dot.ri.gov |
| Jan 26, 2018 | RIDOT | 2017-CB-036 | Open the bid tab ↗pmp.dot.ri.gov |
| Sep 13, 2013 | RIDOT | 2013-CB-024 | Open the bid tab ↗pmp.dot.ri.gov |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Same name in other states: Connecticut.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in