Contractor Missouri
I-Solutions
3Lettings bid
1Agencies
Jul 30, 2024 – Sep 15, 2025Date range
Agencies this contractor has bid with
City of Independence
Items most often priced
- Reconnection & Modification of Existing Facilities (Force Account) / FA
- Willis Ave - US 24 Highway to north - Line "E" Installation of approximately 30 feet of 6-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- US 24 Highway - River Blvd to Cottage Ave - Line "A" Installation of approximately 275 feet of 6-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- US 24 Highway - Crysler Ave to Rier Blvd - Line "A" Installation of approximately 1180 feet of 12-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- US 24 Highway - Crysler Ave to Cottage Ave - Line "A" Installation of 6 water service lines and associated valves and meter pits. / LS
- River Blvd - US 24 Highway to south - Line "D" Installation of approximately 41 feet of 6-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- River Blvd - US 24 Highway to south - Line "C" Installation of 15 water service lines and associated valves and meter pits. / LS
- River Blvd - US 24 Highway to Nickell Ave - Line "C" Installation of approximately 1215 feet of 12-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- Grand Ave - US 24 Highway to south - Line "D" Installation of approximately 138 feet of 6-inch DIP and associated fittings, valves, casings, and hydrants. / LS
- East 23rd St. - East R.D. Mize Rd to S Redwood Ave - Line "F" Installation of approximately 22 feet of 12-inch DIP and associated fittings, valves, casings, and hydrants. / LS
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Sep 15, 2025 | City of Independence | 6" Water Main Replacement - E Rankin Rd and Bellevista Dr | Open the bid tab ↗hubstake.io |
| Aug 23, 2024 | City of Independence | 12" Water Main Replacement - US 24 Hwy (Crysler Ave to River Blvd) | Open the bid tab ↗hubstake.io |
| Jul 30, 2024 | City of Independence | 12" Water Main Replacement - E 23rd St. (RD. Mize Rd. to Redwood Ave) | Open the bid tab ↗hubstake.io |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in