Contractor Missouri
Hutchens Construction Company, LLC
9Lettings bid
1Agencies
Aug 16, 2019 – Sep 18, 2020Date range
Agencies this contractor has bid with
MoDOT
Items most often priced
- Truck or Trailer Mounted Attenuator (Tma) / EA
- Mobilization / LS
- Construction Signs / SF
- Channelizer (Trim Line) / EA
- Temporary Short-term Rumble Strips / EA
- Flag Assembly / EA
- Contractor Furnished Surveying and Staking / LS
- Changeable Message Sign With Communication Interface, Contra Ctor Furnished, Contractor Retained / EA
- Tack Coat / GAL
- Removal of Improvements / LS
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Sep 18, 2020 | MoDOT | 200918-D08 | Open the bid tab ↗modotweb.modot.mo.gov |
| Sep 18, 2020 | MoDOT | 200918-G03 | Open the bid tab ↗modotweb.modot.mo.gov |
| Sep 18, 2020 | MoDOT | 200918-G05 | Open the bid tab ↗modotweb.modot.mo.gov |
| May 15, 2020 | MoDOT | 200515-G02 | Open the bid tab ↗modotweb.modot.mo.gov |
| Feb 21, 2020 | MoDOT | 200221-G01 | Open the bid tab ↗modotweb.modot.mo.gov |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Same name in other states: Arkansas.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in