Contractor Tennessee
F8th Construction Company, LLC
17Lettings bid
1Agencies
Jul 10, 2015 – Mar 26, 2021Date range
Agencies this contractor has bid with
TDOT
Items most often priced
- W Beam GR (Type 2) Mash TL-3 / LF
- Truck Mounted Attenuator W/Mssage Board / DAY
- Tangent Energy Absorbing Term Mash TL-3 / EA
- Stone FOR Guardrail END Terminal PAD / TON
- Single Thrie Rail (type 2) / LF
- Single Guardrail, With Rub-rail (type 2) / LF
- Single Guardrail (type 2) Long Post (9 FT-12 FT) / LF
- Single Guardrail (type 2) Long Post (6 FT-9 FT) / LF
- Single Guardrail (Type 2) / LF
- Rounded End Element / EA
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Mar 26, 2021 | TDOT | CNV118 | Open the bid tab ↗tn.gov |
| Mar 26, 2021 | TDOT | CNV119 | Open the bid tab ↗tn.gov |
| Mar 27, 2020 | TDOT | CNU109 | Open the bid tab ↗tn.gov |
| Mar 27, 2020 | TDOT | CNU110 | Open the bid tab ↗tn.gov |
| Mar 29, 2019 | TDOT | CNT116 | Open the bid tab ↗tn.gov |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in