Contractor Texas
Dnt Construction Llc
10Lettings bid
2Agencies
Aug 18, 2026 – Aug 18, 2026Date range
Agencies this contractor has bid with
San Antonio Water System · Southeast Regional Management District (owner per LJA posting)
Items most often priced
- Utility Spoils, Includes Hauling Excavated Material Onsite, Includes Stripping, Stockpiling Strippings, Placement And Compaction To 95% Standard Proctor Density, With Maximum 8" Lifts, Final Grading, And Re-Application Of Strippings, Complete In Place / CY
- Trench Safety System For Storm Sewer, All Sizes, All Depths, Complete In Place / LF
- Storm Water Pollution Prevention Plan Compliance, Includes General Source Controls And All Items Not Specifically Listed In The Bid Proposal, Complete In Place / LS
- Soil Amendment Profile Allowance (Includes Up To The Following: Application Rate Of 5,000 Lb/Ac Soil Media Such As Progranics, Probitiocs, Organix Biotic, Or Equivalent), Gypsum At Application Rate Of 2,500 Lb/Ac, Slow Release Nitrogen Product At Application Rate Of 160 Lb/Ac, Liquid Stimulants At Application Rate Of 5 Gal/Ac, And Ph Adjustments Within 2.5 Points), As Directed By Engineer And When Authorized By Owner, Complete In Place / SY
- Right Of Way Excavation Includes Hauling Excavated Material To Designated Fill Areas Onsite Using Off Road Trucks, (0.0-0.5 Mile), Stripping, Stockpiling Strippings, Placement And Compaction To +95% Standard Proctor Density, With Maximum 8'' Lifts, And Re- Application Of Stripping To Final Graded Area, Complete In Place / CY
- Reinforced Concrete Type "C" Manhole For 48" Storm Sewer And Larger With Reinforced Concrete Type "E" Inlet Top, All Sides Open, Includes Adjustments, All Depths, Complete In Place / EA
- Pond Excavation Includes Hauling Excavated Material To Designated Fill Areas Onsite Using Off Road Trucks (0.5-1 Mile), Includes Stripping, Stockpiling Strippings, Placement And Compaction To +95% Standard Proctor Density, With Maximum 8'' Lifts, And Re-Application Of Stripping To Final Graded Area, Complete In Place / CY
- Over Excavation Of Unsuitable Material Prior To Fill Placement Within Fill Areas, Includes Excavation, Demucking, Spreading Of Unsuitable Material, And Placement Of Material As Final Lift Upon Completion Of Fill (As Directed By The Engineer And To Be Surveyed And Verified Before Final Payment), Complete In Place / CY
- Outfall Structure, Includes Slope Pavement, Timber Bent (As Necessary), Cut Pipe Flush With Slope Pavement, And All Appurtenances, All Sizes, All Depths, Complete In Place / EA
- Onsite Dust Control, Contractor To Obtain A Water Meter From Texas Water Utilities, L.P. And Water The Site As Needed To Prevent Any Blowing Dust For The Duration Of The Project, Contractor Is Responsible For The Cost Associated With Meter And Purchasing Of The Water From Texas Water Utilites, L.P., Complete In Place / DAY
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Aug 18, 2026 | Southeast Regional Management District (owner per LJA posting) | 6969-1640 | Open the bid tab ↗bids.lja.com |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in