Contractor South Carolina
Dillard Excavating Company, Inc.
9Lettings bid
1Agencies
Oct 10, 2017 – Dec 8, 2020Date range
Agencies this contractor has bid with
SCDOT
Items most often priced
- Waterproofing (Substructure-second Method) / SY
- Utility Staking / LS
- Unclassified Excavation / CY
- U-section Post for Sign Supports - 3P / LF
- U-section Post for Sign Bracing - 2P / LF
- Traffic Control / LS
- Thrie Beam G.r.bridge Conn. (supplemental TO Temporary Concre / EA
- Temporary Yellow Pavement Markers Bi-dir.- 4"x4" / EA
- Temporary Erosion Control Blanket (Ecb) / MSY
- Temporary Cover / ACRE
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| Dec 8, 2020 | SCDOT | 4689670 | Open the bid tab ↗info2.scdot.org |
| Aug 13, 2019 | SCDOT | 5153310 | Open the bid tab ↗info2.scdot.org |
| Jul 9, 2019 | SCDOT | 5304960 | Open the bid tab ↗info2.scdot.org |
| Jun 11, 2019 | SCDOT | 5252330 | Open the bid tab ↗info2.scdot.org |
| May 14, 2019 | SCDOT | 4650570 | Open the bid tab ↗info2.scdot.org |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in