Caldwell Tanks, Inc.
Agencies this contractor has bid with
Town of Lynn (owner per Choice One Engineering posting) · Village of Ansonia (owner per Choice One Engineering posting) · Village of Fort Recovery (owner per Choice One Engineering posting)
Items most often priced
- Water Tower / LS
- Water Tower Electric Service / ALLOW
- Subgrade Compaction, As Per Plan / SY
- Scada System / LS
- Removed, As Per Plan / LS
- Maintaining Traffic / LS
- Excavation, Including Embankment Construction, As Per Plan / CY
- Aggregate Base / CY
- 6" Fire Hydrant Assembly, As Per Plan / EA
- 12" Gate Valve / EA
Item pages show winning bids only; this list says what the contractor priced, not what it won.
Latest source documents
| Letting | Agency | Project | Source |
|---|---|---|---|
| May 2, 2025 | Village of Ansonia (owner per Choice One Engineering posting) | bidtabdarans2201pdf | Open the bid tab ↗choiceoneengineering.com |
| Mar 14, 2024 | Village of Fort Recovery (owner per Choice One Engineering posting) | bidtabmerfre2305pdf | Open the bid tab ↗choiceoneengineering.com |
| Oct 26, 2023 | Town of Lynn (owner per Choice One Engineering posting) | bidtabinranlyn2202pdf | Open the bid tab ↗choiceoneengineering.com |
Names are printed as the bidder on public bid tabulations. Grouping of spelling variants is automatic; tell us if two companies were merged or one was split.
Same name in other states: Ohio, Texas.
Is this your company?
Get your full bid history: where you ranked against every bidder on each letting, and your unit prices against the winning median, item by item.
Start your free trial Benchmark your own bidClaim this page: tell us who you are
Win rate, rank and price position
ProWin rate, where this contractor ranked in each letting, its unit prices against the winning median item by item, price trend by year, every letting with its receipt, and CSV export are part of Pro.
See Pro Sign in